A deadline must not become a blindfold

Marina Costa supports a small-business impact test, one-stop permit process and published service times, while urging safeguards so that silence is not mistaken for permission where safety or heritage is at stake.

Marina CostaCo-author · Red Tape Council · ItalyVerona, Italy
Red Tape25 October 2026Supports
3 pages · US Letter

Use Readable text for larger type, or zoom in on the pages.

Red Tape Council

RC/RT/2026/T.5published

A deadline must not become a blindfold

Letter from the table · RC/RT/2026/T.5

To the Red Tape Council,

I support the Small Business Impact Standard. I also want to warn you about one part of it: a deadline for silence to count as consent must not turn into a blindfold. A deadline can protect a small business from being left in limbo. It can also create a false sense of permission if the application touches safety, accessibility, or a protected building.

In March last year, I applied for permission to put a modest sign outside the rented premises where I work in Verona. The sign was not large, and I wanted it to be visible from the street without changing the building. I submitted the application through the Comune’s designated digital channel for business-related procedures, which routes relevant matters through the SUAP, the one-stop shop for productive activities. I expected that the process might involve more than one office. What I could not tell was which office had the file, what it still needed, or when I should expect an answer.

I filed on 3 March. The receipt confirmed that the documents had arrived, but it did not give me a service time. On 18 March, I received a request for a clearer drawing and confirmation from the property owner. I sent both on 20 March. I also asked whether the sign’s position meant that another technical or heritage review was needed. The reply told me that the question had been passed on. It did not tell me who would answer or by when.

That distinction mattered. Verona has historic buildings, and the rules for work affecting a protected building are not the same as the rules for a routine business form. I did not want to assume that a lack of response meant permission to install something that might require further review. Nor could I afford to keep paying for uncertainty. I held the work, followed up, and paid for another drawing after being asked to clarify the proposal. The direct cost of the drawings and application-related preparation came to

RC/RT/2026/T.5Page 1 of 3
Red Tape CouncilRC/RT/2026/T.5 · Continued

about €640. While I waited, I also paid €900 a month in rent for premises I was trying to make easier to find.

On 7 May, I sent a concise follow-up with the earlier receipt and the date I had supplied the missing documents. I asked for either a decision or a list of the remaining steps. I received a response acknowledging the follow-up, but not a completion date. The authorization arrived on 12 June. In the end, I could proceed. The sign itself was not the hardest part. The hard part was not knowing whether I was waiting for a routine check, a missing document, or an issue that required a different authority to decide.

This is why I support the Council’s proposed direction. A small-business impact test could ask a practical question before a new rule or process is imposed: can a person working alone understand what to submit, where to submit it, what it will cost, and how long the answer should take? A one-stop digital process should mean more than one website. It should give the applicant one file reference, show which office currently has responsibility, and make it clear when a submission is incomplete. Published service times would let an owner plan rather than guess.

But I ask the Council to define the silence rule carefully. If an application is complete, the relevant authority has received it, and the matter is suitable for a time-limited decision, a missed deadline should have a consequence. Otherwise the clock is only decoration. Where a decision may affect public safety, access for others, or a protected building, the consequence should not be automatic permission to act. It should instead be a required escalation: a named office must explain the delay, identify the outstanding check, and give a firm next date. The small business should not carry the cost of an office failing to coordinate, but neither should neighbours or the public be left with an unsafe or unlawful outcome.

I am not asking for a separate rule for every street or every permit. I am asking for a process that distinguishes between a delay that can fairly be resolved by a deadline and a case that needs a reasoned decision. The application should say which kind it is, and the service-time clock should be visible from the start. If the authority needs information from another office, that should be part of its own coordination, not a mystery the applicant has to solve by sending repeated messages.

RC/RT/2026/T.5Page 2 of 3
Red Tape CouncilRC/RT/2026/T.5 · Continued

I support the Standard because a small business cannot plan around silence. Please make the deadline meaningful, publish the clock, and build in a clear route for the cases where consent cannot safely be presumed. That would have helped me understand what was happening, spend less on repeated preparation, and make a decision about the premises with something better than hope.

Marina CostaCo-author · Red Tape CouncilVerona, Italy

RC/RT/2026/T.5Page 3 of 3

Replies 8

Gregorio Yap Tacloban, Philippines · 26 October 2026

I agree that a deadline should not erase a safety check. In the Philippines, I have found that local requirements can involve several desks, and an applicant may not know which one is holding up a file. A one-stop intake is useful only if it also gives one person responsibility for explaining the next step. I would divide applications into clear categories: routine, low-risk requests could qualify for deemed approval after proper notice, while structural, fire, or accessibility questions would require an express decision. Even in the second category, the office should have to explain a delay before the deadline expires. That would protect the public without making applicants chase an invisible file.

Muna Warsame Ottawa, Canada · 28 October 2026

I agree with your concern about turning a useful deadline into a blindfold. In Canada, I have dealt with municipal processes where a small project can be referred to more than one reviewer, and the applicant may not know whether the hold-up is a missing document or a substantive concern. I would keep the one-stop point of contact responsible for that explanation. For low-risk requests, a defined deemed-approval rule could discourage neglect. For applications touching accessibility, public safety, or heritage, the consequence of delay should instead be a written status report, a firm revised date, and escalation to a supervisor. That seems fairer than either blanket consent or an open-ended wait.

Emeka Anozie Lagos, Nigeria · 28 October 2026

I agree that silence should not become permission where people’s safety is involved. In Lagos, I have seen how repeated trips and unanswered follow-ups can consume a day that a small trader needs for actual work. That experience makes me wary of a rule that merely tells applicants to wait longer. The Council should make the authority record every handoff, so the applicant can see which unit has the file and what it is doing. I would reserve automatic approval for applications that are genuinely low-risk and complete, with a clear warning at submission. For any other case, the authority should have to send a reasoned delay notice and give the applicant a way to escalate it.