Letter from the table: The cost of finding out too late

Rosie Parker supports the Small Importer Standard, drawing on a Belfast shipment whose final costs and delays were far beyond the figure she had planned around.

Rosie ParkerContributor · Trade Council · United KingdomBelfast, United Kingdom
Trade23 October 2026Supports
3 pages · US Letter

Use Readable text for larger type, or zoom in on the pages.

Trade Council

RC/TR/2026/T.2published

Letter from the table: The cost of finding out too late

Letter from the table

To the Trade Council,

I support TR-001. I am not asking for small traders to be exempt from tariffs, or for customs rules to be waived because a shipment is small. I am asking for the cost and the steps to be clear before a small business commits money it cannot easily replace.

On 11 August 2026, I paid for a shipment of materials from a supplier outside the UK. I had set aside £3,480 for the goods and the quoted transport. I expected to make a modest margin on the work planned around them. I had checked the figures I was given and thought I had allowed enough room. I had not.

The shipment arrived in Belfast on 21 September. Before it could be released, I was told there were additional charges. The customs declaration needed a commodity code, a customs value and an origin. Those are not optional details: they affect how the goods are treated and what duty applies. But when I asked for a clear landed-cost figure before ordering, I had not received a breakdown that let me see what was included, what was an estimate, and what could still change.

The final charges on the paperwork were £284.60 in customs duty, £146 for clearance and handling, £88 in terminal charges, and £72 for storage. That is £590.60 more than I had set aside. I use postponed VAT accounting, so import VAT was accounted for through my VAT return rather than paid at the border. That helped with the immediate cash demand, but it did not remove the duty or the other charges. I still had to find the money, and I still lost time.

RC/TR/2026/T.2Page 1 of 3
Trade CouncilRC/TR/2026/T.2 · Continued

The storage charge was the part that made the mistake feel expensive twice over. I was trying to establish which amount was duty, which was the agent’s charge, and which was a charge for holding the goods. I was not trying to avoid paying anything. I needed a useful answer quickly enough to make a decision. Instead, I was piecing it together after the shipment had arrived, when every day of uncertainty could add another cost.

I checked the UK Trade Tariff information and asked the customs agent to explain the classification and the basis for the duty. I also checked that the invoice and shipping documents showed the origin and value correctly. That is the work a responsible importer should do. But a lookup tool does not tell you whether the freight quote includes clearance, terminal charges or storage, and it cannot make a vague quote into a reliable total. I had no single document that put the goods, transport, duty and fees side by side before I committed.

As a small business owner, £590.60 is not a rounding error. It was money I had planned to use for wages and other bills. I could not spread it across thousands of orders, and I could not ask a finance department to absorb it while someone investigated. I delayed other spending and spent hours chasing explanations. The goods were not the only thing that arrived late; the information I needed arrived late too.

There is a particular strain in being told that the rules are available if you know where to look. A small importer may be learning the customs process while trying to keep ordinary work moving. A wrong code or an unclear origin can have real consequences. The answer cannot be to guess, or to discover the full cost only when the shipment is already at the port.

The proposed Small Importer Standard would change what I can ask for before placing an order. I want a plain-language explanation of which tariff treatment is being used and why; the assumptions about origin, commodity code and customs value; and a clear separation between duty, VAT, freight, clearance, terminal and other fees. If a figure is provisional, the quote should say what could change it and what information the importer must provide. Forwarders and brokers

RC/TR/2026/T.2Page 2 of 3
Trade CouncilRC/TR/2026/T.2 · Continued

should show a landed-cost estimate in a form that a small business can understand and compare.

I also support size-based thresholds and a phase-in when new trade rules or tariffs apply. A threshold should be designed carefully, not used to hide costs or create a loophole. But where a new requirement is being introduced, small traders need guidance that arrives in time to act on it and a reasonable period to adjust. That is not special treatment. It is a way to make compliance workable for businesses without dedicated customs staff.

My experience is one shipment, not a claim that every charge was wrong. I paid what was due. The problem was that I could not see the whole exposure early enough to plan for it. Please carry that distinction into the draft. A fair standard should not promise that every import has a fixed price; it should make the basis of the price visible before the small importer is committed.

I support TR-001 and ask the Council to keep transparency, usable guidance and a practical phase-in at the centre of its draft.

Rosie ParkerContributor · Trade CouncilBelfast, United Kingdom

RC/TR/2026/T.2Page 3 of 3

Replies 4

Celia Carrillo Quintero Puebla, Mexico · 27 October 2026

I sympathise with Rosie’s experience. In Mexico, I have learned that a transport quote is not necessarily a promise about the total amount needed to receive goods. Customs duty, handling and storage can sit outside the figure that first looks affordable. I agree that the Small Importer Standard should require a written breakdown before a trader commits money, including what is excluded and what could change. I would also ask for a contact who can explain the assumptions in ordinary language. A small importer cannot sensibly compare options if every quote uses a different scope and leaves the uncertainties unstated.

Ana Lucía Yupanqui Rojas Cusco, Peru · 28 October 2026

I agree that finding out about charges after goods arrive can be especially difficult for a small trader. In Peru, I would want the Standard to make clear that an estimate depends on the documents, origin and tariff classification, rather than presenting a provisional figure as settled. At the same time, the importer should be told what information to provide and when, so the estimate can be as reliable as possible. Rosie’s account shows why a cost breakdown should include possible storage and clearance fees. Could the council also distinguish a charge that is genuinely unavoidable from one caused by a preventable delay?

Joseph Green Bristol, United Kingdom · 28 October 2026

I agree with the call for earlier and clearer information, and postponed VAT accounting makes an important distinction: avoiding an immediate VAT payment does not make customs duty, handling or storage disappear. In the UK, I would want a quote to separate those items and explain which are payable before release. I would also ask whether the quoted transport reaches the final destination or only a port or terminal. Rosie’s planned amount and eventual charges are a useful warning, but the Standard should not imply that every variance is a policy failure. It should show the assumptions, the change and the practical consequence for cash flow.